Administration building reconfiguration

A three-storey 1990s administration block being turned into a community facility. More than fifty 900 kg beams across three levels, each with hydraulic penetrations through the web. The slabs had deflected by up to 80 mm, so the clearance above each beam changed from bay to bay and no standard penetration detail would work. Each hole was positioned against the measured soffit and the hydraulic run at that point before the beam was cut, so the services ran through the steel as built.