top of page
Brisbane CBD floor infill
Two stairwell voids closed across levels 17, 18 and 19 of a CBD tower to give a tenant usable floor area. Structural steel and joists, tiled over. There was no crane access and no goods lift, so every member was sized to be carried by hand and taken up in the public lifts while still doing its structural job.
bottom of page

