Fortitude Valley plant deck

An existing plant deck stripped back to its frame and rebuilt with new purlins and grating for a change of use, in the middle of the entertainment district. There was no laydown in the laneway, the street or on the roof, so the erection order was fixed in advance down to each lift: steel, then purlins, then grating. Deliveries were booked 24 hours ahead and every piece went from the truck to its final position in one pick, which kept crane and road closure time down.